I-90 Lakefield to Sherburn traffic reduced to single lane starting Aug. 14

MANKATO, Minn. –Motorists are advised that Interstate 90 from Lakefield to Sherburn will be reduced to one lane each direction with reduced speeds beginning Monday, Aug. 14 as crews apply a surface treatment to preserve the pavement.

The project, which consists of applying oil and small rocks on I-90 from Highway 86 to Highway 4, will seal the surface to prevent early deterioration and add life to the pavement. The work is expected to take about two weeks; one week for each direction (eastbound and westbound).

This segment of I-90 was paved in 2015 as part of a larger design-build project.

For updated road condition information, call 511 or visit www.511mn.org.